Some of the process failures that can be detected by a productionline hipot test include, a transformer wound in such a way that creepage and clearance have been reduced. Instrument transformer theory and testing steve hudson, pe engineering manager 10737 lexington drive knoxville, tn 37932. Testing procedures for power transformer ms excel spreadsheet. Transformer oil test methods include astm, bs,and other recognized transformer oil analysis testing procedures. In addition to dielectric tests of transformers, there are other types of test for checking insulation of transformer, such as lightning impulse test. Morgan lacey in 1925, based on a series of pamphlets entitled transformer abstracts that were. Transformers experience power loss due to load resistance, which you can test with an ohmmeter by touching the meters red and black pins to opposite ends of the transformer s wiring. In addition some other tests are also carried out by the consumer at site before commissioning and also periodically. The current transformer is solely assessed through its external behavior without. Most of the electronic circuits used in have different applications of the transformer. Portable precision current transformer testing ct pt analyzer.

Type test of transformer confirms main and basic design criteria of a production lot. Basics, maintenance, and diagnostics xi contents continued page 9. Power factor is defined as the cosine of the phase angle between voltage and current. In this paper, the different types of transformer testing are mentioned. Transformer book is still in demand is a tribute to the publishers and to the authors who have carried the torch to light our way for 75 years. Some tests are done at manufacturer premises before delivering the transformer. There are various test required on transformer to conform performance of transformer.

Testing power transformers highvoltage transformers are some of the most important and expensive pieces of equipment required for operating a power system. Despite their design differences, the various types employ the same basic principle as discovered in 1831 by michael faraday, and share several key functional parts. Drytype transformer testing introduction the primary concern with all transformers and also the key indicator of life expectancy is the condition of the insulation system. Current transformers play an important role in the monitoring and protection of electrical power systems.

In addition to that some transformer tests are also carried out at the consumer site before commissioning and also periodically in regular and emergency basis through out its service life. In the case of curve 2, with the same reigniting voltage e the arc recovery time t 2 is considerably longer than t 1. The core of a transformer is made of iron whereas thewinding which is wrapped over the ir. For confirming the specifications and performances of an electrical power transformer it has to go through numbers of testing procedures. Portable ct pt analyzertransformer testgfuve electronics. Transformer tests eep electrical engineering portal. Transformer testing has developed considerably over the past years. Testing will commence only after the equipment is completely installed as per approved method statement for the installation of the transformer and released for testing commissioning.

Transformers are an electrical component that transmit electrical energy between at least two circuits. Routine testing of transformer oils and insulating oils on a regular schedule is an accepted industry. Partial discharge testing can detect the presence and location of partial discharge activity in a transformer. Section 7 of the ansineta standard for acceptance testing specifications for electrical power equipment and systems may be reproduced and used on a cut and paste basis for the particular type of equipment to be tested. Sep 26, 2017 for confirming the specifications and performances of an electrical power transformer it has to go through numbers of testing procedures. Transformer oil testing is a proven loss prevention technique which should be a part of any condition based predictive maintenance program. The power factor test determines the power loss of the transformers insulation system by measuring the power angle between an applied ac voltage and the resultant current. One nettlesome aspect of electrical equipment that runs 24 hours a day, seven days a week is the need for continual testing and maintenance to ensure both safety and proper functioning of the system in which the electrical elements lie. In this paper testing of distribution transformer is considered.

Put your ohmmeter on its lowest scale and after removing the plastic sheaths from the conductors, touch its leads together to verify that it is ready for testing. Instrument transformer theory and testing steve hudson, pe. Mainly two types of transformer testing are done at manufacturer premises type. One way to reduce t 1 is to raise the open circuitvoltage of the welding power source, as is evident from fig. Routine tests and type tests of transformers electrical4u. Different types of transformer winding electrical4u. While testing, basic testing requirements and testing codes are set out in the national and international standards. This early warning system can allow maintenance management to identify maintenance priorities, plan work assignment schedules, arrange for outside service, and order. Here we discuss different types of transformers are the step up and step down transformer, distribution transformer, potential transformer, power transformer, 1. Neta is not only for commissioning new equipment but for testing the reliability and performance of existing equipment. In order to provide a broad range of training and real world experiences, avo training institute, inc. Fat or acceptance test or witness test or joint inspection test is.

Standard for acceptance testing specifications for. Testing is the most important activity when any equipment is designed. Specific transformer oil test method availability will vary depending upon location. No avo training instructor nor contract instructor has any proprietary interest in any products, instruments, devices, services, or materials discussed. Power transformer testing procedures and schemes eep. Inspect bolted electrical connections for high resistance using one or more of the following methods. Standard for acceptance testing specifications for electrical. All materials and relevant documentation to this testing works shall be checked by the responsible personnel prior to the commencement of testing activities. This will prevent inaccurate readings and ensure your own safety. Such a failure could result from a new operator in the winding department the hipot test a versatile test. This test is conducted to determine the iron losses or core losses and parameters r0 and x0 of the transformer. Mainly two types of transformer testing are done at manufacturer premises type test of transformer and routine test of transformer. Core and windings of three phase core type transformer. The purchase, preparation, assembly, operation and maintenance of transformers represent a large expense to.

The following sections of the ansineta standard for acceptance testing specifications for. Therefore, it is important to know the working principle, construction and types of transformers used in different analog circuits. How to use an ohmmeter to test an ac transformer sciencing. Traditional current transformer testing follows a blackbox approach.

Transformers regulate the voltage in circuits, but in some cases these can go bad and cause a circuit to not. Power transformer testing procedures and schemes photo credit. This type of transformer is categorized on the basis of a number of turns in the primary and secondary windings and the induced emf. Transformer oil is a required addition to electrical transformers. For dry type transformers, the insulation system consists of the cast resin winding and core insulation. If you are testing a transformer inside equipment plugged into the wall outlet, it is important that you disconnect the plug from the wall before testing. Type test and routine test of transformer electrical mastar. Manufacturers test thousands of distribution transformers at worldwide locations each week. Some transformer testing methods are carried out for confirming the basic design expectation of that transformer. There are different types of windings used for different kinds of applications and arrangements. The goal of partial discharge measurement is to certify that no harmful partial discharge sources exist. To test a transformer, however, you will need to disconnect it from the circuit before doing anything else.

Various types of probes can be used for primary side. Testing of power transformers seems like a similar experience. A variety of types of electrical transformer are made for different purposes. In this book we have laid down important aspects on transformer. The core of a transformer is made of iron whereas thewinding which is wrapped over.

Mainly two types of transformer are done by manufacturer before dispatching the transformer mainly 1 type test of transformer and 2 routine test. Scribd is the worlds largest social reading and publishing site. Ieee standard distinguishes between the following types of tests. Periodically monitoring and preventive maintenance can detect the defects before major damage has been occurred. Different types of transformers and their applications. Ac testing of dry type distribution and power transformers by.

Transformer basicsworking principle,construction,types. Voltage curve 2 has lower peak value than the voltage curve 2. These are the most commonly used transformer types for all the applications. Transformer manufacturers perform two main types of transformer testing type test of transformer and routine test of transformer. The power transformer testing fat test is performed after completion of the assembly at the manufacturing shop. To maximize the life span and effectiveness of a transformer, it is significant to carry out transformer testing to find out possible faults and rectify it in advance. Testing procedures for hv voltage transformers include general inspection, insulation resistance, polarity and turns ration tests.

Routine tests of transformer is mainly for confirming the operational performance of the individual unit in a production lot. The purchase, preparation, assembly, operation and maintenance of transformers represent a large expense to the power system. Nov 17, 2019 core and windings of three phase core type transformer. Partial discharges in transformers are typically measured by applying a prespecified voltage to the transformer windings and measuring induced charges via a coupling device e. Different test like thermography, insulation resistance test, transformer turns ratio test, dissolved gas analysis. Transformer book is still in demand is a tribute to the publishers and to the. On smaller dry type transformers, such as the one shown in figure 1, not a lot of time and money is spent on their testing and maintenance. Transformer is one of the important equipment in power system. Home products transformer testportable ct pt analyzer.

To prove that the transformer meets the customers specifications and design expectations, the transformer has to go through different testing procedures in manufacturer premises. Losses of transformersthe transformers are made of 2 types of materials. It evolved from the simple gonogo verdict into a sophisticated segment within transformer manufacturing. In this paper testing of distribution transformer is. Check that all parts of the transformer are properly assembled and tight. A presentation ontransformer testing using dpatt3bi 2. Transformer testing preliminay test carried out on transformer before it. So, testing the transformer is pretty serious issue. For ideal insulation, the phase angle is 90 degrees, but in practice, no insulation is ideal. Even with the equipment switched off, you might receive a shock or damage the oscillator if the equipment is still plugged in. Testing of any electrical equipment indicates the extent to which the equipment is able to comply with a customers requirements.

The various types of transformer shown in the figure above are explained in the detail below. Windings are the conductors wrapped in various forms like helical, disc, cylindrical, crossover which generates mmf that is carried by the core to other windings for having the different level of voltages. With curve 1 the arc striking voltage is e and the arc recovery time is t 1. Pdf transformer testing type test and routine test of.

Types of transformer different types of transformer. The methods used during tests and measurements of the power transformers, test and measurement circuits, calculations and evaluation criterias are included in this manual. Just be certain to disconnect the transformer from the circuit before testing to avoid the risk of serious injury. In addition to that some transformer tests are also carried out at the consumer site before commissioning. In this test, the rated voltage is applied to the primary usually lowv.

Mainly two types of transformer testing are done at manufacturer premisestype test of transformer and routine test of transformer. Cts are instrument transformers used for converting primary current into a reduced secondary current for use with meters, relays, control equipment and other instruments. Because these generate a lot of heat that must be removed, they need to be insulated and they have to resist sparking, the physical and chemical properties of certain oils make them ideal for use in transformers and capacitors. Routine tests are carried out on every unit manufactured. These methods can be used for new and refurbished transformers.